Road rehabilitation, 14 km
Regrading, drainage and surfacing on a provincial route. Delivered two weeks early.
View projectRoads, culverts and small irrigation structures. Verified with Rahyabe since 2024. Eleven projects finished, nine of them on time.
A civil works contractor building roads, culverts, retaining walls and small irrigation structures. Founded 2016. Works as a main contractor and, on larger builds, as a specialist for earthworks and drainage.
Sector
Construction — civil works
Verified since
2024
Projects finished
11
Finished on time
9 of 11
Permanent staff
34
Largest project to date
Road rehabilitation, 14 km
What the company employs, by role. Named individuals are not shown on a public profile.
Civil engineers
4 — two with ten years or more
Site supervisors
6
Surveyors
2
Machine operators
9
Skilled trades
13
Administration and finance
5
Owned outright unless marked. Counted at the last verification and re-counted at each renewal.
Excavators
3
Wheel loaders
2
Tipper trucks
6
Concrete mixers
4
Vibratory rollers
2 — one leased
Survey equipment
2 total stations
What the company can call on beyond its own plant and people.
Where the company works. Provinces, not addresses — a public profile carries coverage, never a street.
Primary
Kabul, Parwan, Kapisa
Will mobilise to
Bamyan, Logar
Has worked in
Nangarhar (2 projects)
Registered in
Afghanistan
Each one carries an expiry date, and an expired licence closes a gate rather than raising a note. Dates below are invented.
Business licence
Valid to 2027-03-31
Construction category
Valid to 2026-11-30
Tax identity
On record and current
Sanctions screening
Last run 2026-08-02 — clear
Recorded where there is something behind them. A claim with no document is not shown.
Finished work, measured from the record rather than written as a reference.
Regrading, drainage and surfacing on a provincial route. Delivered two weeks early.
View projectConcrete lining and four offtake structures. Delivered on the agreed date.
View projectBoundary wall, surface drainage and a culvert crossing. Delivered eleven days late after a materials delay.
View projectIf you are funding work, tell us what you need built. If you build, tell us what you have finished.